• Dwell
    • Microhousing: an overview
    • Minim House
    • Studio Shed
    • Boombox Container Studio
    • DC Students Tiny House
  • Tech
    • Off grid water
    • Off grid greywater
    • Off grid sanitation
    • Off grid electric
    • Off grid cooking
    • Heating- Air
    • Heating- Water
    • Cooling
    • Air quality
    • Micro transport
  • Furnish
    • Transforming Tables
    • Convertible Beds
    • Compact Seating
    • Micro Kitchens
    • Bath
  • Grow
    • Habitat
    • Vegetables
    • Fruit
    • Honey
    • Food preservation
  • Policy
    • Mission + Strategy
    • Microhouse Finance
    • Microhouse Insurance
    • DC Policy on Trailers
    • DC Policy on Housing
  • Tour
  • Blog
  • Team
  • FAQs
Find us
Like Us
Micro ShowcaseMicro Showcase
  • Dwell
    • Microhousing: an overview
    • Minim House
    • Studio Shed
    • Boombox Container Studio
    • DC Students Tiny House
  • Tech
    • Off grid water
    • Off grid greywater
    • Off grid sanitation
    • Off grid electric
    • Off grid cooking
    • Heating- Air
    • Heating- Water
    • Cooling
    • Air quality
    • Micro transport
  • Furnish
    • Transforming Tables
    • Convertible Beds
    • Compact Seating
    • Micro Kitchens
    • Bath
  • Grow
    • Habitat
    • Vegetables
    • Fruit
    • Honey
    • Food preservation
  • Policy
    • Mission + Strategy
    • Microhouse Finance
    • Microhouse Insurance
    • DC Policy on Trailers
    • DC Policy on Housing
  • Tour
  • Blog
  • Team
  • FAQs

lot update (early may): site preparation starts

May 7, 2012 Posted by Brian The Site

After 3 visits to DCRA, 4 contractor bids, and many hours of site planning, the concrete removal, site grading and cleanup work got underway last week.  First step was to remove a stolen abandoned minivan off the site (thanks DC MPD!). Then the goal was to remove all the concrete and asphalt from the site to allow better drainage, and have a clean slate to build the community garden on. To save on costs I spent a few days pulling up about half of the concrete on the site with a sledge hammer and pickax, then the guys at The Construction Group helped with further excavation, hauling and recycling the concrete, and grading the garden area.  The remaining work took a crew of 4 three full days– just the jackhammering of a small 60 ft2 area took 7 hours.  With the purchase of an old push mower from a neighbor, things are starting to look good.

Share

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Send Message

Subscribe

Enter email address to follow blog + receive new post notifications.

Join 1,749 other subscribers

Events

No events

© 2015 · Micro Showcase

Prev Next
 

Loading Comments...